Slope reinforcement site
EST. 1986 · DONGA SPECIAL CONSTRUCTION

The depth of technology
that holds the slope.

Korea’s pioneer in slope stability. 40 years of field experience and 2,360MPa high-strength strand technology deliver the most reliable geotechnical and disaster-prevention solutions.

40 yrs
Heritage & Trust
Experience since 1986
31
Technology Patents
Results of innovation
356
Completed Projects
Successfully delivered
01 — ABOUT
1986
A slope-stability specialist that pioneered the field in Korea.

“Better technology for ultimate safety.”

As the company that pioneered slope stabilization in Korea in 1986, Donga Special Construction has invested relentlessly in new technology and met every challenge with pride. Never settling for the status quo, we keep sharpening our expertise with the latest equipment and methods to be the partner our clients trust most — always thinking one step ahead.

Read CEO message
03 — TECHNOLOGY

2,360MPa strand,
engineered to share the load.

Permanent-anchor technology using high-strength strand stabilizes rock and cut/fill slopes. A compression-composite anchorage removes concentrated load and sustains long-term tension.

View patents & R&D
2,360
MPa strength
High-strength strand
40+
yrs field work
Since 1986
31
Patents
Continuous R&D
356
Projects
Nationwide

Let’s start your project.

Our engineering team proposes a tailored solution optimized for your project requirements.

Contact us